Glass House 25
Logs Featured - 205 x 275 mm high log profile
Basic Dimensions - 7855 mm x 4000 mm
Living Area - 24.5 m2
Total Area - 36 m2 (incl decked areas & steps)
Kontio's glass houses afford a level of style and healthier living, designed really as homes, three models, such as 25, featured here, similar in design to 25NF but deeper so offers more flexibility.
Design is subject to Planning Permission in the UK

A versatile building solution that can be put to a number of uses including:
- Garden room
- Sauna
- Pool room
- Outdoor entertaining
- One building, many uses, two other floor plans not featured here
Constructed using laminated Arctic pine logs that offer superior performance and longevity over other garden buildings using softwoods for warmer climes.


